- Insights, stories & events
- Case studies
- ASRS warehouse for Coca-Cola
Increasing storage capacity through automation for Coca-Cola
Case study
How we increased Coca-Cola Europacific Partners’ storage capacity and throughput, with zero operational disruption An expansion of the existing ASRS, including a new 32-meter-high clad-rack equipped with four cranes.

Results
Unlock the full case study
Get the full details on the challenges and extraordinary outcomes. Download the complete case study.