Results

100% uninterrupted production during modernization

The warehouse upgrade, including pallet conveyors and control systems, was completed without stopping the three-shift operation, ensuring continuous production.

Up to 50% faster order processing

New stacker cranes and optimized pallet conveyors accelerated material flow and retrieval, reducing handling times and boosting warehouse efficiency.

100% visibility of warehouse operations

The K.Sight PMS-V system provided full transparency of processes, enabling better monitoring, planning, and coordination across the warehouse.